English

టెండర్లు

Improvements to the Mahathma Gandhi Inner Ring Road from Autonagar to Gorantla Village in Guntur

RFP for Engagement of Consultancy Services for Conducting Feasibility Study and preparing Detailed Project Report for Construction of R.O.B in lieu of existing Railway Crossing No 03/26-28 of Vijayawada-Guntur Section in the alignment of Inner Ring Road Guntur near Gaddipadu in Andhra Pradesh

Maintenance of Greenery for 3 years and development of the fencing and irrigation system in the gap areas on Central Median of National Highway from Venkateshwara foundry, Bhavanipuram, Vijayawada to Ibrahimpatnam junction (10.3km) and along Ibrahimpatnam junction to ferry road(3.3km)

Construction of CC Drain with slab along NH-16 at Ramavarappadu Jn, Vijayawada, Krishna District

Development and Maintenance of Plantation in the median of NH 16 from Gannavaram to Swarna bharat trust till Pottipadu Toll gate in a total Length of 7.8 Km - ECV - Rs. 1,90,20,180/-

Corrigendum (dates extension)

“ETS Survey , Geotechnical Investigation, Design, Approval of detailed engineering GFC ( Good for Construction ) drawings and Construction of Roads (BT & PQC), Bridges, Storm Water Drains, Culverts, Water Supply, Sewerage & STP, Utility Ducts for Power & ICT, Reuse Waterline & Avenue Plantation in layouts for Land Pooling Schemes of Kondamrajupalem (P) & Rayapudi (P) in Zone - 6 are in Amaravathi Capital City, Andhra Pradesh Compatible with Trunk Infrastructure being executed / Completed on EPC basis along with LMC (Last Mile Connectivity) in respect of Water, Sewerage & Storm Connectivity including performance based O&M for a period of 07 years (Including DLP of 02 years). duly following the IRC/ MOST / CPHEEO / BIS / ISO / NEC(Nation Electric Code)/ NBC / NIDM Guide Lines / ECBC / EEC / MID - EC norms including all the state of the art green features applicable for infrastructure projects and in conformity with the best National and International Practices.” IBM Value : Rs.

Development of Roads, Drains, Water Supply, Sewerage, STP, utility ducts for Power & ICT, Reuse waterline & Avenue Plantation compatible with trunk infrastructure in Layouts for Land Pooling Schemes Abbarajupalem, Borupalem, Dondapadu, Thulluru (P), Ananthavaram (P), Pichukapalem (P) and Rayapudi (P) in Zone 5 area of Amaravati Capital City, Andhra Pradesh & Performance based O&M of the infrastructure created for a period of 10 years on Hybrid Annuity Model Basis (HAM)

Corrigendum (Concession Agreement)

RFP for Engagement of Project Management Consultant (PMC) for Investigation, Design and Construction of Roads, Drains, Water Supply, Sewerage, STP, Utility Ducts for Power & ICT, Reuse waterline & Avenue Plantation, Compatible with Trunk Infrastructure in Layouts for Land Pooling Schemes for Kondamarajupalem (P) and Rayapudi (P) In Zone-6 area in Amaravati Capital City, Andhra Pradesh

RFP for Engagement of Project Management Consultant (PMC) for Investigation, Design and Construction of Roads, Drains, Water Supply, Sewerage, STP, Utility Ducts for Power & ICT, Reuse waterline & Avenue Plantation, Compatible with Trunk Infrastructure in Layouts for Land Pooling Schemes for Kondamarajupalem (P), Lingayapalem (P), Uddandarayunipalem (P), Velagapudi (P) and Mandadam (P) In Zone-7 area in Amaravati Capital City, Andhra Pradesh

RFP for Engagement of Project Management Consultant (PMC) for Investigation, Design and Construction of Roads, Drains, Water Supply, Sewerage, STP, Utility Ducts for Power & ICT, Reuse waterline & Avenue Plantation, Compatible with Trunk Infrastructure in Layouts for Land Pooling Schemes for Inavolu(P), Krishnayapalem(P), Kuragallu(P), Mandadam(P) & Nowuluru(P) In Zone-10 area in Amaravati Capital City, Andhra Pradesh

"Consultancy for Comprehensive Architectural Services of Raj Bhavan and CM'S Residence in Amaravati Government Complex.

RFQ for Empanelment of Landscape Architects for Projects in Amaravati Capital City, Andhra Pradesh

రాజధాని ప్రాంత అభివృద్ధి ప్రాధికార సంస్థ గురించి

అమరావతిని ప్రపంచ శ్రేణి ఆంధ్రప్రదేశ్ ప్రజారాజధానిగా నిర్మించడంలో ఆంధ్రప్రదేశ్ రాజధాని ప్రాంతాభివృద్ధి ప్రాధికర సంస్థ (ఏపిసిఆర్ డిఎ) ప్రధాన మార్గదర్శకవ్యవస్థగా ఉంది. హరితరాజధాని తరహా నగరాలలో ఒకటిగా ఉండే అమరావతి నిర్మాణంలో 24 గంటలూ అవిశ్రాంతంగా పని చేస్తున్న వృత్తి నిపుణులతో ప్రణాళిక, ఇంజనీరింగ్, సాంకేతిక పరిజ్ఞానం మరియు అమలు విషయంలో నిపుణత, అనుభవం మరియు ఆవిష్కరణ సామర్ద్యాలను చేర్చుతూ ఏపిసిఆర్ డిఎ ను ఏర్పాటు చేయడమయింది. అమరావతి నూతన రాజధాని ప్రాంతాన్ని ఏర్పాటు చేసి, అభివృద్ధి చేయడానికి 2014, చట్టం(2014 లోనిచట్టంనెం.11) ద్వారా ఆంధ్రప్రదేశ్ ప్రభుత్వం ఏపిసిఆర్ డిఎ ను ప్రకటించింది. ఆంధ్రప్రదేశ్ రాజధాని ప్రాంతంగా సుమారు 8603 చదరపు కి.మీ. మరియు రాజధాని నగరంగా 217.23 చదరపు కి.మీ. విస్తీర్ణం స్థూలంగా నోటిఫికేషన్పరిధిలోకి వస్తుంది. అమరావతి రాజధాని ప్రాంతంలో సమ్మిళిత మౌళిక సదుపాయాలవృద్ధి మరియు సమగ్రపట్టణాభివృద్ధికి సంబంధించిన ప్రణాళిక, సమన్వయం, నిర్వాహణ మరియు ఆర్ధికసహాయానికి ఏపిసిఆర్ డిఎ వీలుకలిగిస్తుంది. అంతేగాక పట్టాన సేవలు మరియు వాటికి సంబంధించి ఉత్పన్నమయ్యే అనుబంధ అంశాలన్నింటిని నిర్వహిస్తుంది.

వార్తలు-కార్యక్రమాలు

తరచుగా అడిగే ప్రశ్నలు

   Copyright 2015 APCRDA   Site Best viewed in ie9 above / Chrome Website counter
Designed & Developed by